you path:longshida >> Products

QS filling water type submersible pump

times:

QS filling water type submersible pump

One, product introduction
QS series submersible pump, is my factory according to the years of submersible pump production experience combined with market demand and the design of a small size, reliable performance, pump integrated, dived into the water running water lifting tools, widely used in agricultural irrigation, industrial and civil construction supply, drainage system, fountain works, as well as hills in low-lying areas, water diversion, drainage, into the market by the vast number of users, have fully demonstrated its convenient, reliable, durable, economic and other characteristics.
Its characteristics are: motor, water pump are assembled into a whole, and has the advantages of simple structure, convenient installation and disassembly, installation and little occupation area, main advantages are: reliable, durable, easy to use, high power, less failure, repair cost etc.. As long as the motor is filled with clear water, can be normal operation. At present, our company can provide users with head 5-80 m 10-250 m³/ hour; traffic; motor power 2.2-7.5KW dozens of types of submersible pump.
QS type submersible pump executive standard: JB/T8092-2006 " " small submersible pump
Two, the use of conditions
Power frequency voltage: 50HZ, 380V ±5% three-phase AC power supply.
Quality requirements: the water temperature is not more than +30 DEG C without corrosive water, the water containing solid impurities in the volume ratio of not more than 0.01%, particle size of no greater than 0.2 mm; the pH value of water should be in 6.5~ 8.5 between.
The electric pump shall be completely immersed in water, submerged depth of not less than 0.5 meters, no more than 5 meters.
Three, technical specifications
1, meaning of the type:

In 2, the main technical data: ( see table)
Four, structural description
In 1, QS submersible electric pump is composed of a water pump, submersible motor is composed of two parts.
By 2, pump impeller, guide vane ( housing ), inlet, outlet section and other components. The impeller is fixed by a conical sleeve or key.
In 3, the water filling type submersible electric motor structure, cavity is filled with water, is mainly used for motor cooling and lubrication of journal bearing; the stator winding of the motor by using resistance wire, has good water resistance, rotor cage structure. The motor is provided with a water injection hole and an exhaust hole, the lower end is provided with a water hole. The motor is provided with a thrust bearing and thrust plate, mainly bear axial force and the weight of rotor pump. Rotor shaft extends into the office with rubber sand throwing apparatus and a skeleton oil seal, composed of sand body, can effectively prevent sand from entering the motor.
In five, the installation and use
1, ready to work
1) the use of the environment must be consistent with this specification condition, should not irrigation and drainage, ammonia, lime slurry water containing solid particles or high corrosive water.
2) must be recommended lift range selection.
3) check the shaft rotation is flexible, there should be no card dead.
4) open the exhaust and water plug, to the motor cavity filled with clear water. Pay attention to prevent false full, good plug, due to water leakage phenomenon.
5) with 500 to vanquish megger measuring motor must, should not be less than 50M Ω.
6) put the switch, instantaneous loading motor ( less than one second ), to see whether the steering motor and sign the same; if the contrary, replace the power supply two joint can, try to turn, must from the pump outlet to be poured into the water, the water outflow section when they start.
7) electric pump with short cable factory, electric pump cable joints shall be respectively using ordinary adhesive tape, adhesive tape, plastic d'Amiens insulating adhesive bandage, guarantee that the water can not be immersed into the joint. (cable connector method shown in Figure )
8) to ensure safety, pump before use, should install the reliable grounding cable.
9) prepare sleepers or rope, steel pipe two, lashing cable with soft wire or twine cable.
2, installation
1) electric pump installed in formation, with bamboo bundle in the electric pump is, use a tripod or near the boat near the bridge pier 's list,. Around the weeds must be removed, and must not be stuck in the mud, resulting in too high temperature rise and burn motor.
2) well installed, with a rope or cable wire rope system software on each section of water conveyance pipe. Pump found stuck, can not be forcibly pump, electric pump and the well wall to avoid locking phenomenon. Water pipe rubber pad to pad, bolt tightening uniform, to avoid the water leakage.
3) electric pump diving depth should not be too deep, the dynamic water level from 0.5 to 5 meters is appropriate.
4) electric pump must be separately installed switch and a starting protector, and other electrical devices may not be shared, and must be matched with motor power, rated current protection device rotary position shall not be arbitrarily changed, in order to prevent loss of protective effect. If not with the starting protector for use without damage to the electric pump, the factory will not be responsible for.
3, the use of
1) with 500 to vanquish megger measuring motor winding insulation resistance against ground value should not be less than 5000000000000 ohm.
2) electric pump start, observation instrument current, voltage is consistent with the nominal range, the sound operation of any abnormal and vibration. If it is not normal to should be solved in time.
3) pump operating process, we should always observe the voltage, current, flow rate, head, such as the discovery of the following circumstances should immediately stop running.
A. when rated voltage current exceeds a rated value.
B. rated head, flow is normally larger decline.
C. insulation resistance less than 500000000000 ohm.
D. intermittent water pump.
E. electric pump is a sudden audible or larger vibration.
F. protection switch tripping frequently.
4) stop is power off, restart, need to wait for 5 minutes or longer, to prevent excessive temperature rise of motor.
Six, points for attention in use
QS submersible pump is a total lift pump, should first of all in the recommended range of use, and separately using appropriate protection switch. Do not move the electric pump in operation process.
Before diving, instantaneous starting motor, steering motor to whether accord with mark read, dived into the insulation resistance shall not be less than 5000000000000 ohm.
Electric pump in operation, the current is over the rated value, flow decrease, the insulation is less than 500000000000 ohm, motor larger vibration should be down to check.
Remember well before the motor must be filled with clear water, tighten the water injection, the gas plug, or are not allowed to use.
Cable and electric pump lead connector should be reliable connection, tight seal.
Electric pump storage, first put the net inside the motor water ( water plug in electric pump bottom end ), dry surface dressing of cable, stored in a clean, non-corrosive material, room temperature not under 0 ℃is not higher than 30 ℃.
Electric pump during starting, running, stop, if there is any abnormal condition should be shut down for inspection, and actively to plant advice and contact repair.
Seven, maintenance and maintenance
1, strive for electric pump in normal operation.
In 2, the electric pump every 1000 hours of operation for a major overhaul. ( in the best manufacturers designated repair point ) maintenance project:
A, remove all parts cleaning.
B, replacing the skeleton oil seal and rubber bearing.
C, to replace the damaged parts.
Electric pump without coupling when the disassembly sequence is:
Cable shield→→→strainer outlet guide vanes of impeller inlet section, part, part, upper guide bearing part, lower guide bearing and rotor, rotor parts
Electric pump coupling when the disassembly sequence is:
Cable shield→→inlet strainer section and diversion shell bolt and coupling screw to the motor and pump to remove coupling isolation
Pump disassembly taper sleeve: ( dismounting cylinder tap )→→→impeller housing on the housing
Dismantle: sand throwing apparatus, water Festival guide bearing seat, the lower guide bearing seat and rotor, rotor
3, regular mobile workplace and use electric pumps, each run out of time, remove the filtering net, unscrew the screws, water injection and exhaust hole filled with water, and then release the motor lower discharge screw plug, on the motor cavity for cleaning.
 

Eight, breakdown and elimination method
QS submersible pump main technical parameter:

 

Specifications Model Water pump Electric machine
Flow rate Lift Rotational speed Outlet size Rated power Rated voltage Rated current Maximum diameter of
QS10-36/2-2.2 10 36 2850 40 2.2 380 5.7 190
QS10-54/3-3 10 54 2850 40 3 380 7.5 190
QS10-70/4-4 10 70 2850 40 4 380 9.8 190
QS10-90/5-5.5 10 90 2850 40 5.5 380 13.1 190
QS10-108/6-5.5 10 108 2850 40 5.5 380 13.1 190
QS10-126/7-7.5 10 126 2850 40 7.5 380 17.4 190
QS15-26-2.2 15 26 2850 2 2.2 380 5.7 190
QS15-34/2-3 15 34 2850 2 3 380 7 190
QS15-52/4-4 15 52 2850 2 4 380 9.4 190
QS15-65/5-5.5 15 65 2850 2 5.5 380 13.4 190
QS15-78/6-5.5 15 78 2850 50 5.5 380 13.4 190
QS15-91/7-7.5 15 91 2850 50 7.5 380 17.4 190
QS15-104/8-7.5 15 104 2850 50 7.5 380 17.4 190
QS20-30/2-3 20 30 2850 2.5 3 380 7 184
QS20-40/2-4 20 40 2850 2.5 4 380 9.4 184
QS20-54/3-5.5 20 54 2850 2.5 5.5 380 13.4 184
QS20-75/3-7.5 20 75 2850 2.5 7.5 380 18.6 184
QS20-81/6-7.5 20 81 2850 75 7.5 380 17.4 184
QS25-17-2.2 25 17 2850 2.5 2.2 380 5.7 184
QS25-25-3 25 25 2850 2.5 3 380 7 184
QS25-36/2-4 25 36 2850 2.5 4 380 9.4 184
QS25-44/2-5.5 25 44 2850 2.5 5.5 380 13.4 184
QS25-60/3-7.5 25 60 2850 2.5 7.5 380 18.6 184
QS32-20-3 32 20 2850 3 3 380 7 184
QS30-30/2-4 30 30 2850 3 4 380 9.4 184
QS30-36/2-5.5 30 36 2850 3 5.5 380 13.4 184
QS30-45/3-5.5 30 45 2850 3 5.5 380 13.4 184
QS30-54/3-7.5 30 54 2850 3 7.5 380 18.6 184
QS40-16-3 40 16 2850 3 3 380 7 184
QS40-21-4 40 21 2850 3 4 380 9.4 184
QS40-28-5.5 40 28 2850 3 5.5 380 13.4 184
QS40-32/2-5.5 40 32 2850 3 5.5 380 13.4 184
QS40-40/2-7.5 40 40 2850 3 7.5 380 18.6 184
QS45-16-3 45 16 2850 3 3 380 7 184
QS45-25-5.5 45 25 2850 3 5.5 380 13.4 184
QS50-18-4 50 18 2850 4 4 380 9.4 184
QS50-24-5.5 50 24 2850 4 5.5 380 13.4 184
QS50-30/2-7.5 50 30 2850 4 7.5 380 18.6 184
QS50-39/3-7.5 50 39 2850 4 7.5 380 18.6 184
QS65-7-2.2 65 7 2850 4 2.2 380 5.7 184


QS submersible pump main technical parameters

 

Specifications Model Water pump Electric machinery
Flow rate Lift Rotational speed Outlet size Rated power Rated voltage Rated current Maximum diameter of
QS65-10-3 65 10 2850 4 3 380 7 184
QS65-13-4 65 13 2850 4 4 380 9.4 184
QS60-20-5.5 65 20 2850 4 5.5 380 13.4 184
QS65-25-7.5 65 25 2850 4 7.5 380 18.6 184
QS80-11-4 80 11 2850 4 4 380 9.4 184
QS80-22-7.5 80 24 2850 4 7.5 380 18.6 184
QS80-24/2-7.5 80 24 2850 4 7.5 380 18.6 184
QS100-8-4 100 8 2850 4 4 380 9.4 184
QS100-15-7.5 100 15 2850 6 7.5 380 18.6 184
QS120-7-4 120 7 2850 6 4 380 9.4 220
QS120-10-5.5 120 10 2850 6 5.5 380 13.4 220
QS120-18/2-7.5 120 18 2850 6 7.5 380 18.6 220
QS160-8-5.5 160 8 2850 6 5.5 380 13.4 220
QS200-5-4 200 5 2850 6 4 380 9.4 220
QS210-10-7.5 210 10 2850 6 7.5 380 18.6 220
QS220-5-5.5 220 5 2850 6 5.5 380 13.4 184
QS250-5-5.5 250 5 2850 6 5.5 380 13.4 220
QS250-8-7.5 250 8 2850 6 7.5 380 18.6 220

Note: if the product after changing table parameters and the parameters are not identical, to product certification, nameplate shall prevail!
Irrigation method ( must be filled with water, or are not allowed to use ) ( strictly anhydrous idling test machine ) electric pump placed in wells or other water sources before, must use clean water ( not including sand ) filled with motor. Irrigation, motor should be erected, can not be inclined, first remove the connection section two injection screw, as shown in the illustration, the conical funnel or pipe is inserted in the connecting rib plate on one of Kong Zhongxian water flushing, another hole for venting purposes. Filled with water, open the bottom drain bolt, the water out chamber until the release of the water flushing, cleaning. Then, tighten the bottom drain bolt, formal irrigation, filled with water, to make the motor rest 30 minutes, let the winding of the bubble ( fully escape, gently shake the motor can accelerate the bubble escape ), then add a small amount of water will be a motor filled, screwed into the rib plate two injection screw fastening.

 

Products

Copyright©Wenzhou Yongjia LongShiDa Deep well pump industry Co., Ltd.
Tel: 0577-67372866 13868871312 Fax: 0577-67950575 Add: Yongjia County of Wenzhou City Industrial Zone Oubei White
喷泉泵 深井泵 小型潜水泵 潜水消防泵 SP深井潜水泵 4SJ深井潜水泵 不锈钢深井泵 太阳能深井泵